top of page

43A HAY’S MEWS W1

REFURBISHMENT OF RESIDENTIAL MEWS HOUSE IN THE MAYFAIR CONSERVATION AREA

 

STAGE 4 DESIGN COMPLETED | 2018

CONSTRUCTION ESTIMATE | £ 380,000

 

CLIENT | BERKELEY SQUARE HOLDINGS

PROJECT MANAGEMENT | ASTREA ASSET MANAGEMENT

PLANNING CONSENT | GEOFF BROWN STUDIO
ARCHITECTURE | GEOFF BROWN STUDIO

STRUCTURAL ENGINEERING | PGCS PARTNERSHIP

BUILDING SERVICES | PETER DEER AND ASSOCIATES

ACOUSTIC CONSULTANCY | DEANE AUSTIN ASSOCIATES

COST CONSULTANCY | SAWYER AND FISHER

CDM ADVISER + PRINCIPAL DESIGNER | CDM SOLUTIONS

CONTRACTOR | NOT YET APPOINTED

 

GEOFF BROWN STUDIO TEAM:

GEOFF BROWN | ANDRE LOBAO | ANNA BOROWSKA 

 

PROJECT DESCRIPTION:

PLANNING PERMISSION TO INSTALL A CONDENSER UNIT IN THE
GARAGE AND REPLACEMENT OF THE EXISTING GARAGE DOORS TO 

PROVIDE A DECORATIVE VENTILATION GRILLE ABOVE NEW 

GARAGE DOORS.

SCHEME FOR COMPLETE STRIP OUT OF THE DUPLEX APARTMENT

ABOVE THE GARAGE AND FULL REFURBISHMENT WITH AN
OPEN PLAN LIVING / KITCHEN SPACE, NEW ENSUITE BATHROOM, 

NEW ELECTRICAL AND PLUMBING SERVICES, AS WELL AS COMFORT
COOLING TO THE BEDROOM AND LIVING SPACE.

PROJECT CURRENTLY AWAITING CLIENT INSTRUCTION TO MOVE

TO THE CONSTRUCTION PHASE.