49 HAY’S MEWS W1
MAJOR REFURBISHMENT OF FIVE STOREY OFFICE BUILDING
COMPLETED | 2017
CONSTRUCTION VALUE | £ 1.27 MILLION
CLIENT | BERKELEY SQUARE HOLDINGS
PROJECT MANAGEMENT | ASTREA ASSET MANAGEMENT
PLANNING | GEOFF BROWN STUDIO
ARCHITECTURE | GEOFF BROWN STUDIO
CONTRACT ADMINISTRATION | GEOFF BROWN STUDIO
STRUCTURAL ENGINEERING | BRIDGES POUND
BUILDING SERVICES | PETER DEER AND ASSOCIATES
COST CONSULTANCY | CLUTTONS
CDM ADVISER + PRINCIPAL DESIGNER | QUOIN CONSULTANCY
CONTRACTOR | CUBE INTERIOR SOLUTIONS
GEOFF BROWN STUDIO TEAM:
GEOFF BROWN | GIORGIO ANDREINI | ANNA BOROWSKA |
ANDRE LOBAO
PROJECT DESCRIPTION:
PLANNING PERMISSION TO CONVERT THE GROUND FLOOR GARAGE
TO OFFICE SPACE, REMODEL THE GROUND FLOOR FAÇADE,
AND INSTALL SIX CONDENSER UNITS IN AN ACOUSTIC ENCLOSURE
AT ROOF LEVEL IN THE MAYFAIR CONSERVATION AREA
THE WORKS COMPRISED THE COMPLETE GUTTING AND
REFURBISHMENT OF THE ENTIRE BUILDING INCLUDING
RECONSTRUCTION OF THE THIRD FLOOR MANSARD, AND
INSTALLATION OF SLIDING-FOLDING DOORS, BALUSTRADING,
AND LIGHTING TO THE FRONT TERRACE.
THE TOILET CORE WAS REPOSITIONED AGAINST THE PARTY WALL
TO OPEN UP THE OFFICE SPACE, AND A DRAINED CAVITY TANKING
SYSTEM WAS INSTALLED IN THE BASEMENT.
A NEW ENTRANCE HALL WAS CREATED WITH WALNUT PANELLING
AND FEATURE LINEAR LIGHTING.
THE ORIGINAL STAIRCASE WAS RADICALLY ALTERED WITH A NEW
BALUSTRADE, AND THE TREADS AND RISERS OVERCLAD IN SOLID
WALNUT.