49 HAY’S MEWS W1

MAJOR REFURBISHMENT OF FIVE STOREY OFFICE BUILDING

 

COMPLETED | 2017

CONSTRUCTION VALUE | £ 1.27 MILLION

 

CLIENT | BERKELEY SQUARE HOLDINGS

PROJECT MANAGEMENT | ASTREA ASSET MANAGEMENT

PLANNING | GEOFF BROWN STUDIO
ARCHITECTURE | GEOFF BROWN STUDIO

CONTRACT ADMINISTRATION | GEOFF BROWN STUDIO

STRUCTURAL ENGINEERING | BRIDGES POUND

BUILDING SERVICES | PETER DEER AND ASSOCIATES

COST CONSULTANCY | CLUTTONS

CDM ADVISER + PRINCIPAL DESIGNER | QUOIN CONSULTANCY

CONTRACTOR | CUBE INTERIOR SOLUTIONS

 

GEOFF BROWN STUDIO TEAM:

GEOFF BROWN | GIORGIO ANDREINI | ANNA BOROWSKA |

ANDRE LOBAO

 

PROJECT DESCRIPTION:

PLANNING PERMISSION TO CONVERT THE GROUND FLOOR GARAGE
TO OFFICE SPACE, REMODEL THE GROUND FLOOR FAÇADE,
AND INSTALL SIX CONDENSER UNITS IN AN ACOUSTIC ENCLOSURE

AT ROOF LEVEL IN THE MAYFAIR CONSERVATION AREA
THE WORKS COMPRISED THE COMPLETE GUTTING AND 

REFURBISHMENT OF THE ENTIRE BUILDING INCLUDING 

RECONSTRUCTION OF THE THIRD FLOOR MANSARD, AND 

INSTALLATION OF SLIDING-FOLDING DOORS, BALUSTRADING,

AND LIGHTING TO THE FRONT TERRACE.

THE TOILET CORE WAS REPOSITIONED AGAINST THE PARTY WALL

TO OPEN UP THE OFFICE SPACE, AND A DRAINED CAVITY TANKING
SYSTEM WAS INSTALLED IN THE BASEMENT.

A NEW ENTRANCE HALL WAS CREATED WITH WALNUT PANELLING

AND FEATURE LINEAR LIGHTING.

THE ORIGINAL STAIRCASE WAS RADICALLY ALTERED WITH A NEW
BALUSTRADE, AND THE TREADS AND RISERS OVERCLAD IN SOLID
WALNUT.